Spectran Group delivered specialist bridge strengthening and concrete remediation works at Queens Walk Bridge in New Town for the City of Hobart.
The project involved extensive remediation and precision preparation of the existing concrete bridge soffit to enable installation of a carbon fibre laminate strengthening system. The existing underside of the bridge presented a particularly rough and uneven substrate, requiring detailed grinding, repair and finishing to meet the stringent surface requirements of the project specification.
A key achievement was the team’s ability to achieve surface tolerances as tight as 1mm in critical areas while working overhead in challenging conditions. The quality and precision of the preparation works resulted in successful sign-off for installation of the carbon fibre strengthening system, marking a significant milestone in the bridge strengthening program.
Scope of Works
The project demonstrates Spectran Group’s capability to deliver technically demanding structural remediation and bridge strengthening works, combining specialist workmanship, precision surface preparation and rigorous safety controls. Successful final inspections with the City of Hobart and Pitt & Sherry reflected the quality of the completed works and the collaborative approach taken by the project team.
ClientCity of HobartServicesBridge Strengthening, Concrete Remediation & Carbon Fibre StrengtheningYear2026