Spectran delivered an 8.4km potable water HDPE pipeline between Ellendale and the Fentonbury Pump Station, incorporating butt welding and electrofusion installation methods across both trafficable and non-trafficable environments.
Despite live traffic, challenging weather and multiple concurrent work fronts, the project was delivered with an outstanding safety and quality record. Spectran achieved over 11,600 hours LTI-free, maintained 100% pass rates for compaction testing, butt weld testing and hydrostatic pressure testing, and proactively identified and resolved manufacturer defects in electrofusion couplers through collaboration with the client, engineers and suppliers. The team consistently exceeded productivity targets by operating multiple crews simultaneously while maintaining exceptional quality standards.
ClientTasWater CDOServicesPipeline Installation and Traffic ManagementYear2021